Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Illuminance is measured on a defined plane such as a desk or floor. Layout, reflections, mounting height and maintenance affect it; average and minimum values differ.
Why it matters on a project
Lamp output alone does not establish light reaching the task surface.
Measurement and pricing
Use a defined measurement grid and plane, recording operating state, daylight and instrument calibration.
Worked example
For the unit definition only, 6000 lumens incident uniformly on 20 m² gives 6000 ÷ 20 = 300 lux. This is flux reaching the surface, not lamp lumens before losses.
Common mistake
Treating one reading beneath a luminaire as the room average.
Frequently asked questions
Are lux and lumens identical?
Lux is lumens per square metre of receiving surface.
Is daylight included in testing?
Record and control daylight according to the measurement purpose and method.
Related terms
- LED lightingEnergy-efficient light fittings with set colour and output.
- Illuminance uniformityA ratio describing illuminance variation across a defined area.
- Reflected ceiling planA drawing of suspended ceilings, their levels, lights and diffusers.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote