Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Illuminance uniformity

انتظام الاستضاءة

A ratio describing illuminance variation across a defined area.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Uniformity commonly uses minimum divided by average illuminance, but state the definition. Use one measurement grid and plane; uniformity does not replace glare assessment.

Why it matters on a project

A good average can conceal dark spots in reading or circulation areas.

Measurement and pricing

Check grid, area boundaries, point distribution, average, minimum and the project's criterion.

Worked example

An example grid gives average 300 lux and minimum 180 lux: minimum-to-average uniformity is 180 ÷ 300 = 0.6. Compare with the space's specified criterion; this is not a universal acceptance limit.

Common mistake

Confusing minimum-to-average with minimum-to-maximum or omitting low readings.

Frequently asked questions

Will increasing the average solve it?

Unevenness may remain; review layout and distribution.

Is measurement always at floor level?

Choose the plane required for the surface and task.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote