Definition
The process covers pre-start checks, tests, adjustment, integration and records as required. Verify supplies, protection, instruments and witnessing arrangements before tests.
Why it matters on a project
Briefly switching equipment on does not prove capacity, control or protective response.
Measurement and pricing
Compare results with defined criteria and record conditions, settings, instruments, findings and retests.
Worked example
A plan has 20 tests: 15 passed, 3 failed and 2 not performed, totalling 15 + 3 + 2 = 20. Tests still requiring verified success total 3 + 2 = 5. The count does not weight criticality.
Common mistake
Signing a generic form without traceable readings and operating conditions.
Frequently asked questions
Does a running pump prove performance?
No. Test flow, head, controls and protection under the plan.
Are isolated system tests sufficient?
Also complete required integrated tests and cross-system response sequences.
Related terms
- Inspection and test planA schedule defining activity checks, acceptance criteria, responsibilities and records.
- Handover document registerA register tracking required operational and handover records and their status.
- Instrument calibration certificateA record of instrument comparison against a documented measurement reference.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote