Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Engineering consultancy / BIM modelling and Navisworks coordination

BIM modelling and Navisworks coordination for contractors

We build a Revit model from your tender drawings at LOD 300, federate the disciplines, run Navisworks clash tests for each pair of disciplines, and hand you a report showing who resolves each clash, with 2D drawings for site. Work is remote, and a second engineer reviews the set before delivery.

Revit model: aerial view from the north-west

BIM modelling and Navisworks coordinationPublished pricing unit: floor

Combined services drawing from · before VATSaudi riyal 350
Minimum orderSaudi riyal 2,000
On every project
1 working day to a fixed quote
LOD 300 Revit modelling from tender drawings
2 revision rounds included
179 sheets coordinated in Navisworks on one project

Scope

What you receive

Revit model at LOD 300 built from tender drawings
Federated model of architecture, structure and MEP
Navisworks clash tests for each pair of disciplines
Clash report with location, disciplines and who resolves each item
Revision register tracking every clash to closure
2D drawings extracted from the model for site
Model data shared through Speckle so your team can view it in a browser
Second engineer review of the set before delivery

Prices

Published price

ServiceCodePrice (SAR)UnitMinimum
Combined services drawingSD-COORD350floor2,000

This is the published price tied to coordination: the 2D combined services drawing. There is no published unit price for Revit modelling and Navisworks clash rounds; they are priced in a fixed quotation after we review the drawings. Prices exclude 15% VAT in Saudi Arabia. See all prices in the service packages, or get a quick estimate from the price calculator.

Which drawings we start from

We receive tender or issued-for-construction drawings in DWG or PDF for each discipline and build a Revit model at LOD 300 for the elements that matter to coordination: structure, walls, ceilings, openings, pipe and duct routes and electrical routes. The models are then federated in Navisworks.

If you already have a Revit model we work on it directly. For existing buildings the model can be built from a laser scan through the survey and laser scanning service.

Clash tests and the report

We run a separate clash test for each pair of disciplines, such as structure against HVAC, HVAC against drainage and electrical against structure, so each test reads clearly in review. The clash report records the location, a snapshot, the two disciplines involved and who resolves each item. See also what clash detection means.

We update the revision register with every new drawing issue, so you can see which clashes are closed and which remain open, and we extract 2D sheets from the coordinated model for site use.

Our work

A 179-sheet shop drawing issue for a multi-purpose hall in the Eastern Province, coordinated in Navisworks through nine clash tests between disciplines. We also prepared a 3D model of a steel car park canopy of 1,960 m². Client names are withheld out of respect for their privacy.

Limits of the service

Work is fully remote, and site visits are in Riyadh only. We do not stamp drawings or the model ourselves; stamping goes through a licensed local engineering office or the consultant. Coordination results are based on the drawings received, so a later design change means updating the tests and the report.

Proof from real work

What we actually deliver: a coordinated model, a programme and sheets

Navisworks service details

From a multi-purpose hall project in the Eastern Province: 179 sheets coordinated in Navisworks through nine clash tests between disciplines. Client names are masked for privacy.

Before we start

What we need from you

Tender or construction drawings for each discipline in DWG or PDF
Existing Revit models, if any
The disciplines to be coordinated
Project specifications and consultant requirements
The drawing issue date you are working to

How we work

Four steps from drawings to delivery

01

Send drawings

Send each discipline’s drawings and the coordination scope.

02

Fixed quote

We review the drawings and send a fixed quotation within one working day.

03

50% advance

Work starts on receipt: we build the model, run the clash tests and update the register.

04

Review and delivery

A second engineer reviews the set; we then deliver the model, report and drawings for review, with final files released after the final payment, and two revision rounds.

A Revit model from our work

Revit model: aerial view from the north-west

Revit model of a dangerous-goods inspection shed in Saudi Arabia: aerial view

Revit model: steel structure with the roof off

The same model: steel structure with the roof off · Project page

Frequently asked questions

Do you build the Revit model from tender drawings?

Yes, at LOD 300 from tender or issued-for-construction drawings for each discipline you need coordinated, or we work on your existing model.

What does the clash report include?

Each clash with its location, a snapshot, the two disciplines involved and who resolves it, with a revision register that tracks every item to closure.

Do you stamp the drawings or the model?

No, we do not stamp. Stamping goes through a licensed local engineering office or the consultant, and a second engineer reviews the files with us before delivery.

What does modelling and coordination cost, and do you visit site?

There is no published unit price for modelling and Navisworks rounds, so each is priced in a fixed quotation after we review the drawings. The published price is the combined services drawing at SAR 350 per floor, minimum SAR 2,000 before VAT. Work is remote, and site visits are in Riyadh only.

Try us before you sign

A free quantity take-off of one sheet, delivered within two days

Send one drawing sheet (PDF or DWG) on WhatsApp and get a free quantity take-off of it, delivered within two days. One sheet per client, quantities only (no pricing), villas and mid-size buildings.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts