Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Lippage is a local height difference at adjoining tile edges, distinct from drainage fall or overall floor flatness. Tile warpage, substrate preparation, installation and joint width affect it.
Why it matters on a project
It can create a trip point or visible edge, particularly with large tiles and grazing light.
Measurement and pricing
Measure at the joint with a suitable tool, considering edge profile and product warpage, then compare with the specification and approved sample.
Worked example
Adjacent edge readings are 100.2 mm and 101.0 mm from the same measurement reference: difference is 101.0 − 100.2 = 0.8 mm. Assess acceptance using the specification, measurement method and edge type.
Common mistake
Using levelling clips instead of preparing the substrate or ignoring tile warpage before laying.
Frequently asked questions
Is a drainage fall lippage?
Fall is an intended surface gradient; lippage is a local step at a joint and is assessed separately.
Do clips guarantee no lippage?
No. Substrate preparation, tile checks, adhesive application and laying remain essential.
Related terms
- Porcelain tilesHigh-density, low-absorption ceramic tiles suited to heavy-use floors.
- Surface preparationCleaning a steel surface to a specified grade (e.g. SSPC-SP 10) before coating to ensure adhesion.
- Mock-upA full-size sample built to approve appearance and quality before full production.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote