Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Shared coordinates

الإحداثيات المشتركة

An agreed reference for model position, orientation and elevation.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Shared coordinates relate discipline models to a common position, orientation and vertical datum. Units, control point and north direction are documented instead of visually moving files into place.

Why it matters on a project

They preserve alignment with the survey and prevent clashes caused by shifting an entire model.

Measurement and pricing

Check known non-collinear control points and an independent elevation benchmark. Verify the transformation after export.

Worked example

A survey control point at 612.40 m corresponds to model level 0.00 m: model level 3.20 m is at 612.40 + 3.20 = 615.60 m, assuming consistent vertical datum and units.

Common mistake

Fixing model misalignment by moving elements internally without correcting its coordinate relationship to the source.

Frequently asked questions

Is one check point sufficient?

No. It may hide rotation or scale errors; check multiple points, directions and elevations.

Is true north the same as project north?

They can differ. Document the rotation between them.

Related terms

  • BIM (Building Information Modelling)A 3D digital model carrying element information, used for coordination and quantity take-off.
  • Federated modelDiscipline models combined for review while retaining their source identity.
  • Site planA drawing showing the building within the plot with setbacks, entrances and levels.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote