Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A clash matrix organizes which systems are compared, such as ducts against beams and pipes against cable trays. It defines test type, thresholds, justified exclusions and resolution ownership.
Why it matters on a project
It prevents omitted disciplines and reduces duplicate results that obscure important conflicts.
Measurement and pricing
Review selection sets, their contents and test settings, then inspect sample results to confirm that intended elements are being tested.
Worked example
A services-to-structure test checks intersections, while an equipment-to-wall test checks maintenance space. The same distance threshold is not automatically appropriate to both.
Common mistake
Treating every detected result as a separate problem when several results arise from one duct crossing.
Frequently asked questions
Should everything be tested against everything?
That can create duplicates. Organize system pairs by coordination need and document exclusions.
How is resolution demonstrated?
Rerun the test on an updated issue and check the result and related drawings.
Related terms
- Clash detectionChecking models to find where disciplines collide before construction.
- Federated modelDiscipline models combined for review while retaining their source identity.
- Coordinated services drawingA drawing combining service routes and levels within the available space.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote