Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A hard clash occurs when two model solids intersect, such as a duct entering a beam. Results require engineering interpretation because some intersections, such as pipe-to-fitting connections, are intentional.
Why it matters on a project
It identifies locations needing routing or design changes before installation.
Measurement and pricing
Inspect the intersection in section and verify dimensions, revision and exclusions. Hiding a result does not resolve its source geometry.
Worked example
A duct top at 3.15 m crosses a beam soffit at 3.10 m: vertical overlap is 3.15 − 3.10 = 0.05 m. Review the section and resolve the clash without an unauthorized structural alteration.
Common mistake
Cutting structure on site to bypass a clash instead of referring it to the designer and updating the drawings.
Frequently asked questions
Is every intersection a fault?
No. Some connections intentionally intersect; assess their function.
Can a small overlap be ignored?
Size alone is insufficient. Check tolerances, insulation and constructability and record the decision.
Related terms
- Clash detectionChecking models to find where disciplines collide before construction.
- Clash matrixA table specifying system pairs, test types and resolution responsibility.
- Structural drawingsDrawings of foundations, columns, beams and slabs with their reinforcement.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote