Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Permit drawing set

حزمة مخططات الترخيص

The drawing package submitted for project permitting review.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A permit drawing set comprises drawings and information required by the relevant permit route for the site and building type. Establish its checklist from current official requirements and the authority's request, controlling revisions and property identity.

Why it matters on a project

It addresses missing information and inconsistent areas or boundaries across disciplines before submission.

Measurement and pricing

Reconcile land data, site plan, levels, areas and revisions against project records and case-specific requirements.

Worked example

Before submitting a villa package, the office reconciles plot identity, boundaries, area schedule and related drawings, then checks missing information against the official case-specific requirements.

Common mistake

Treating another project's package as a fixed checklist for every municipality or building type.

Frequently asked questions

Is this an official document checklist?

No. It explains the package; obtain project requirements from the relevant authority.

Are permit drawings enough for detailed construction?

Do not assume so. Check the need for coordinated shop drawings and approved details.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote