Permit drawing revision

تعديل مخططات الترخيص

A revised issue showing changes to permit-related drawings.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A permit drawing revision records changes from the previous package and their effects on areas, facades, structure and services. The responsible office checks the required official process before implementing a permit-affecting change.

Why it matters on a project

It prevents divergence between site documents and information reviewed by the authority.

Measurement and pricing

Compare revisions, compile changes and check affected documents and the status of the process required for the project.

Worked example

An illustrative revision raises floor area from 180 to 192 m²: increase is 192 − 180 = 12 m². Record and assess its effects; the calculation establishes neither permission nor approval.

Common mistake

Building an area increase as a minor internal adjustment without reviewing its implications and approval route.

Frequently asked questions

Does every internal change avoid a permit process?

No blanket rule applies here; the office checks effects and current official requirements.

Is owner approval enough?

Owner approval does not replace designer review or any official process required for the case.