An identifier linking a model element to records, checks and quantities.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A model element identifier distinguishes an object within an authoring or exchange system. It links objects to clashes, schedules and comments, but stability across revisions and formats must be tested.

Why it matters on a project

It enables tracking a particular wall or opening without relying on an old screenshot or repeated name.

Measurement and pricing

Check missing and duplicate identifiers and follow a sample object through export, recording source file and revision alongside its identifier.

Worked example

The same local element number appears in two files. The checker records discipline file and revision with the identifier, then associates the issue with the correct object during rechecking.

Common mistake

Treating a local element number as globally unique when another discipline file can contain the same number.

Frequently asked questions

Will an identifier survive recreating an element?

It may change. Test traceability rather than relying on the number alone.

Can a name replace an identifier?

Names can repeat. Use them alongside source, location and identifier.

Related terms

  • BIM (Building Information Modelling)A 3D digital model carrying element information, used for coordination and quantity take-off.
  • Federated modelDiscipline models combined for review while retaining their source identity.
  • Quantity take-offExtracting quantities from drawings under defined measurement rules, with a reference for every figure.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote