Category: Contracts & management
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A drawing transmittal is a numbered, dated issue record listing drawings, revisions, attachments, recipients and purpose, such as review or construction. It records the contents of the issued package.
Why it matters on a project
It separates delivery from approval and allows tracking of the drawings issued to each party. Evidence that they were reviewed comes from the recorded review response.
Measurement and pricing
Check file names, revision identifiers and attachment counts against the list, retaining receipt evidence under the project procedure.
Worked example
A transmittal lists 12 architectural and 8 services sheets: 12 + 8 = 20 drawing files are expected if each sheet has its own file. Check revisions as well as count.
Common mistake
Sending files under a general message title without revision identifiers, then relying on that message to establish what reached site.
Frequently asked questions
Does receipt mean approval?
No. Technical review or approval is recorded separately under the procedure.
What if an attachment is missing?
Record the omission and obtain the correct package before releasing it for construction.
Related terms
- Drawing registerA list controlling drawing numbers, revisions and review status.
- Drawing revisionA number and date that identify each changed version of a drawing.
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote