Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Verification directory

Verification directory

Instead of name lists that go out of date, this page links to the official bodies where you can verify an engineer, contractor, engineering office or laboratory yourself before you sign, with what to ask for each one.

Engineers · Contractors · Engineering offices and building permits · Soil and testing laboratories · Fire and life safety · Subcontractors and suppliers

Engineers

Saudi Council of EngineersRegistration and professional accreditation of engineers and technicians in Saudi Arabia, including verifying an engineer membership and grade. Official site
Egyptian Engineers SyndicateRegistration and licence to practise for engineers in Egypt. Official site

What to check: Before you sign: ask for the engineer membership number, verify it, and check that the discipline and grade suit the work.

Contractors

Muqawil platformThe Saudi Contractors Authority platform for contractor registration, profiles and search. Official site
Etimad platformThe government tenders and procurement platform, where tenders are published and bids submitted. Official site

What to check: Before award: check the commercial registration and that the contractor classification covers the field and the grade for the project value, and ask for similar past work you can visit.

Engineering offices and building permits

Balady platformMunicipal building permits, occupancy certificates and engineering office services. Official site
Saudi Building CodeThe code requirements a project is designed, built and inspected against. Official site

What to check: Permit drawings are stamped by an engineering office licensed in Saudi Arabia. We prepare the design and shop drawings, and the permit file is submitted through a licensed office.

Soil and testing laboratories

Saudi Accreditation CenterAccreditation of laboratories and inspection and calibration bodies, with a directory of accredited bodies. Official site

What to check: Ask for the laboratory accreditation certificate and its scope, and check that the test you need (soil, concrete or steel) is within that scope.

Fire and life safety

Salamah platform, Civil DefenseSafety licences and fire protection requirements for buildings. Official site
MODON, industrial citiesServices and requirements for factories and facilities in industrial cities. Official site

What to check: Fire protection drawings are approved by the authority through an office accredited with it. We design and coordinate MEP systems and prepare occupational health and safety plans for projects.

Subcontractors and suppliers

Supplier and subcontractor registration with Arab CreatorsRegister your company to receive our requests for quotation. Open page
CareersFor engineers and technicians who want to work with us. Open page

What to check: We ask every supplier and subcontractor for the commercial registration, Zakat and tax certificate and past work before any purchase order.

Links go to the official sites. Their services change from time to time, so check the current service on the authority site. Links last checked: 7 November 2026.