Waterproofing upstand

وزرة العزل المائي

The vertical continuation of waterproofing from a floor onto a wall or edge.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A waterproofing upstand continues the membrane at floor-to-wall junctions or thresholds. Height, termination and corner reinforcement follow the approved wet-area detail and waterproofing system.

Why it matters on a project

It protects edges but does not replace wall waterproofing in spray zones where required.

Measurement and pricing

Measure height from the finish reference stated in the detail and inspect corners, joints, terminations and penetrations before covering.

Worked example

A 3 × 2 m room has perimeter 2 × (3 + 2) = 10 m. Excluding a 0.90 m doorway and assuming a 0.20 m upstand: length is 10 − 0.90 = 9.10 m and area is 9.10 × 0.20 = 1.82 m². Threshold sealing and membrane laps are outside this example.

Common mistake

Measuring upstand height from the structural slab and discovering that the floor build-up covers most of it.

Frequently asked questions

Is the example height a rule for every bathroom?

No. Use the approved detail, system and exposure requirements.

Can waterproofing stop at the doorway?

The threshold needs a designed detail maintaining waterproofing continuity.

Related terms

  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
  • Floor screedA thin mortar or concrete layer that levels the floor before tiles or parquet.
  • Bitumen membraneModified bitumen waterproofing rolls bonded by torch.