Voltage drop

هبوط الجهد

The difference between circuit source voltage and load-end voltage.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Voltage drop results from conductor impedance carrying current and depends on length, section, temperature, power factor and circuit arrangement. Check it alongside current capacity and protection, not instead of them.

Why it matters on a project

Nearby equipment can work correctly while a distant load is affected if the actual route length was ignored.

Measurement and pricing

Calculate using cable data, route length, design current and the appropriate circuit method, or measure under known load. Compare with the applicable project criterion.

Worked example

Source voltage is 230 V and load voltage is 224 V under the same condition: drop is 230 − 224 = 6 V, or 6 ÷ 230 × 100 = 2.61% approximately. This is an arithmetic example, not acceptance or cable selection.

Common mistake

Applying a single-phase formula to a three-phase circuit or doubling the route length twice.

Frequently asked questions

Does a voltage-drop check alone select the cable?

No. Also check ampacity, protection, fault conditions and installation factors.

Does a no-load reading establish operating drop?

No. State the load condition under which readings are taken.