Category: Structure & materials
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Punching shear is a potential local failure around a column or concentrated load in a slab or footing. Design checks a defined critical perimeter, including openings, edges, moment transfer and any required reinforcement.
Why it matters on a project
It can govern flat-slab thickness or require local structural provisions around columns.
Measurement and pricing
The engineer checks actions, effective dimensions, critical perimeter and resistance under the design basis. Load divided by column area is not sufficient.
Worked example
For units only, assume net shear 400 kN, a specified example perimeter of 4 m and effective depth 0.20 m: shear area is 4 × 0.20 = 0.80 m², giving average stress 400 ÷ 0.80 = 500 kPa, or 500 ÷ 1000 = 0.50 MPa. This is not a complete strength check and excludes moment transfer.
Common mistake
Adding an opening near a column without reassessing critical perimeter and force transfer.
Frequently asked questions
Is the perimeter simply the column face?
Its location and shape follow the design basis and condition, not the example.
Does adding flexural steel always solve it?
No. The designer chooses a solution after checking shear mechanism, detailing and actions.
Related terms
- Flat slabA concrete slab supported directly on columns without beams.
- Footings (foundations)Structural elements that transfer the building loads to the soil.
- Structural drawingsDrawings of foundations, columns, beams and slabs with their reinforcement.