Pump total dynamic head

الرفع الديناميكي الكلي للمضخة

The head added by a pump to meet system requirements and losses.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Required head includes elevation and pressure differences and flow-dependent losses, accounting for inlet pressure and velocity differences where relevant. Express all terms consistently as liquid head.

Why it matters on a project

Building height alone does not provide required pressure at the remote fixture.

Measurement and pricing

Define reference points, design flow, pipe sizes, fittings and source and outlet pressures.

Worked example

From an open tank surface to a fixture, neglecting velocity-head difference: elevation is 12 m, required residual head 18 m and losses 7 m, giving 12 + 18 + 7 = 37 m. Initial gauge pressure at the tank surface is zero.

Common mistake

Counting elevation twice or ignoring available inlet pressure.

Frequently asked questions

Are pipe losses constant?

They depend on flow, diameter, roughness and fittings.

Is inlet pressure simply added?

Use the energy balance with correct signs; available source pressure usually reduces required pump head.