Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A deflection head accommodates specified vertical movement without transferring floor load into non-loadbearing studs. Clearances, fixings and seals must preserve system performance.
Why it matters on a project
Incorrect fixing can make the partition an unintended support and crack its boards.
Measurement and pricing
Check movement range and direction, stud engagement, screw locations and fire and acoustic details.
Worked example
An example requires 12 mm downward movement and the detail provides 15 mm: difference is 15 − 12 = 3 mm. Acceptance also requires tolerance, engagement and fire checks.
Common mistake
Screwing board, stud and track together where movement is required.
Frequently asked questions
Can the gap be filled with compound?
Use only specified materials and details preserving movement and performance.
Is movement equal in both directions?
Not necessarily; the designer defines range, direction and installation position.
Related terms
- Gypsum board (drywall)Gypsum panels on metal framing for dry walls and ceilings.
- Deflection limitA serviceability criterion for deflection under a stated condition.
- Penetration firestoppingA system preserving fire barrier performance where services pass through it.