The office's published sample set
Sample villa drawings and quantity takeoff
Four drawing sheets and a quantity workbook from the published Arab Creators sample set. Prepared by the office to show drawing presentation and traceable quantities. This is a public office sample, not a client project or a construction issue.
Purpose of the sample
The office prepared this public set to show how drawings are organized and quantities are linked to drawing references. It is the published Arab Creators sample set, not a record of a client project or completed site work.
Drawings and quantity workbook
The set covers architecture SD-AR-101, structure SD-ST-201, HVAC SD-HV-301 and fire sprinklers SD-FF-401. The workbook contains dimension references, civil calculations, a bar bending schedule, HVAC and fire calculations, the quantity schedule and exclusions.
Figures from the sample
The sample workbook records 73.78 m³ of concrete and 8,962.3 kg of reinforcement before waste, 12 doors, 12 windows, 23 sprinkler heads and 34 pipe hangers. These figures cover the stated sample scope, not a complete villa.
Limits of use
This is a portfolio sample, not for construction. The takeoff excludes foundations, the ground slab, stair flights, electrical and plumbing work, among the exclusions stated in the workbook. Waste percentages are estimates. Engineering review is required before pricing use or preparation of a construction issue.
An approval field or preparer name in the sample is not project approval or a certificate of site execution. Actual project requirements must be reviewed against that project's own documents.
The four sheets and displayed figures were matched to sample pages and workbook cells. Crops were visually checked, and concrete, reinforcement and opening totals were independently calculated.