Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architect vacancy

Join the design team at Arab Creators for Engineering Consultancy and work on residential, commercial and villa projects in Saudi Arabia, from our Cairo office or remotely.

Classical villa at shell stage
Location
Cairo or remote
Employment
Full time
Experience
3 years minimum
Posted
11 October 2026

About the company

Arab Creators for Engineering Consultancy is an engineering office based in Cairo serving projects in Saudi Arabia and the Gulf: architectural, structural and MEP design, construction and shop drawings, and quantity take-off. Our team works with contractors and owners on residential, commercial and villa projects, and we are looking for an architect to join the design team.

Main tasks

  • Architectural design and design development of residential, commercial and villa projects in Saudi Arabia.
  • Construction and shop drawings in AutoCAD and Revit to the Saudi Building Code (SBC) and municipality (Balady) requirements.
  • Facade design following the Saudi Architecture design guidelines.
  • 3D renders in 3ds Max with V-Ray, or in Lumion or Enscape.
  • Coordination with the structural and MEP disciplines.
  • Support for quantity take-off.

Requirements

  • B.Sc. in Architecture.
  • At least 3 years of experience; experience on projects in Saudi Arabia is preferred.
  • Strong AutoCAD and Revit skills.
  • 3ds Max with V-Ray, or Lumion.
  • Knowledge of the Saudi Building Code (SBC) and Balady submissions.
  • A portfolio is required to apply.
  • Arabic and English.
  • Saudi Council of Engineers membership is a plus.

Work location: Cairo (Arab Creators office) or remote

Application form

How we hire

  1. We review your application and portfolio within a week.
  2. Technical interview with the projects manager.
  3. A short design task when needed.
  4. A written offer stating the tasks, work location and start date.