Civil & Structural Works
We build concrete structures, foundations and masonry to approved drawings and Saudi Building Code requirements, with material and concrete acceptance testing at every stage.
- Site preparation: clearing, grading and compaction
- Foundations: blinding concrete, isolated footings, raft foundations and piles
- Reinforced concrete: columns, beams, slabs, retaining walls and stairs
- Masonry: blockwork, brickwork and plastering
- Tower and equipment foundations with epoxy-coated reinforcement
Infrastructure & Earthworks
We deliver project infrastructure, from excavation and backfill to roads and drainage networks, with the right plant and field crews experienced in varied terrain.
- Roads: grading, paving and internal and external road networks
- Sewer and stormwater drainage networks
- Concrete channels and trenches
- Deep excavation, layered backfill and compaction
- Safe demolition of buildings and structures, with debris removal
Telecom Tower Erection
We deliver telecom tower sites end to end, from concrete foundations to crane erection of the tower and site fencing, including sites in the Hail Region.
- Tower foundations and reinforcement
- Assembly and crane erection of lattice towers
- Site fencing and equipment plinths
- Associated site civil works
- Safety controls for work at height and lifting operations
Finishing & Fit-out
We hand over commercial and office spaces ready to operate, fully coordinating finishing, MEP and joinery works.
- Showroom, retail and office fit-out
- Suspended ceilings, gypsum and metal-stud partitions
- Flooring: tiles, marble, timber and epoxy
- Interior and exterior painting
- Stone cladding, glazing and façade cladding
- Joinery and decorative works
Waterproofing & Insulation
We protect buildings from moisture and leaks and improve their energy efficiency, using approved insulation systems and acceptance testing before handover.
- Roof waterproofing with liquid-applied and bituminous membrane systems
- Waterproofing of foundations, tanks and wet areas
- Thermal insulation of roofs and walls
- Flood testing before handover
- Leak remediation in existing buildings
MEP Works
We install electrical, mechanical and low-current systems, including testing and commissioning to project specifications and applicable standards.
- Electrical: MV/LV, panels, cabling and lighting
- Low current: fire alarm, CCTV, data networks, PA/sound, access control and BMS
- HVAC: supply, installation and maintenance
- Firefighting systems
- Plumbing and drainage within buildings
- Testing, commissioning and handover
Operation, Maintenance & Facility Services
We protect the value of real-estate assets through preventive maintenance programmes that extend building life and reduce breakdowns and operating costs.
- Preventive and corrective maintenance of buildings and systems
- Facility management for commercial complexes and facilities
- Operation and maintenance of cold-storage warehouses
- Building condition assessment, renovation and extension
- Facility cleaning services
Equipment & Logistics
We provide the heavy equipment and transport projects need, with qualified operators and scheduling that keeps work moving.
- Heavy equipment rental with qualified operators
- Transport of construction materials, soil and debris
- Equipment scheduling and site operation
Technical Office
Our technical office supports the projects we execute, from estimation to handover.
- Drawing review, quantity take-off and estimation
- Shop drawings and method statements
- Setting-out surveys and building lines
- Primavera P6 programmes and progress reports
- As-built drawings and handover files
Prefabricated Buildings & Portable Cabins
We supply and install prefabricated buildings and portable cabins for site offices, workshops and accommodation, galvanised steel frame, insulated panels and weather-resistant exterior finish, wired, lit and handed over ready for use.
- Site offices and portable cabins built to size
- Galvanised steel frame on raised base
- Thermally insulated sandwich panels, weather-resistant finish
- Aluminium windows and doors, internal and external lighting
- Transport, installation and on-site connection